Short Lead Time for Air Cooled Industrial Chiller - WVCP550 Water Vapor Cryopump Cryogenic Refrigeration Systems – Xieyi
Short Lead Time for Air Cooled Industrial Chiller - WVCP550 Water Vapor Cryopump Cryogenic Refrigeration Systems – Xieyi Detail:
Product Description
The Xieyi cryogenic machine realizes the functions of cooling down to -110°C in 3 minutes, returning to 10°C in 2 minutes, and cooling down again in 5 minutes.
Xieyi WVCP Cryochillers are the most cost-effective upgrade that you can add to any diffusion-pumped, turbopumped, or helium-cryopumped system.
Xieyi WVCP Cryochillers are compliant with the Montreal Protocol.
Compliant to EU certificate.
The Xieyi company can customize equipment to meet the needs of customers for more personalization and usage scenarios. We propose 128 rapid response promised services, meet customer’s urgent needs, and fulfill customer’s wishes.
Guangzhou Xieyi company has a senior and professional technical team of engineers carrying forward the “”extreme professionalism, craftsman spirit”, continuous improvement, research and development. We committed to providing customers with stable and reliable products and fast and excellent services.
Technical Parameter
Model | WVCP550-S-H | WVCP550-D-H |
Maximum cooling capacity(W) | 550 | 550 |
The theory maximum pumping speed of tubular cold trap(L/S) | 47040 | 47040 |
The theory maximum speed of plate cold trap(L/S) | / | / |
Final vacuum(mbar) | 2*10-8 | 2*10-8 |
Defrost time of maximum cold trap area(min) | <3 | <3 |
Adjustable range of defrost temperature(℃) | -20~30 | -20~30 |
Pressure control mode | Digital sensor+Mechanical switch | Digital sensor+Mechanical switch |
Quick restore balance pressure function(QRBP) | Yes | Yes |
Oil blocking proof function(OBP) | Yes | Yes |
4G Remote control | Yes | Yes |
Cold media properties | Pro-enviroment | Pro-enviroment |
Maximum surface area of tubular cold trap(㎡) | 0.32 | 0.32 |
Maximum surface area of plate cold trap(㎡) | / | / |
Specification of single cold trap(㎡) | φ12.7mm*8m | / |
Specification of double cold trap(㎡) | / | 2*φ12.7mm*4m |
Gas interface | 12.7 copper welded junction(Standard) | 12.7 copper welded junction(Standard) |
ParkerCPI/VCR(Optional) | ParkerCPI/VCR(Optional) | |
Cooling water flow(L/Min at 24℃) | 10 | 10 |
Cooling water alarm temperature(℃) | 38 | 38 |
Cooling tower | Yes | Yes |
Cooling water connector(L/S) | G3/4 | G3/4 |
Maximum load power(kW) | / | / |
Compressor nominal power(HP) | 5 | 5 |
Power supply(50HZ) | 380-400V AC 3P(H) | 380-400V AC 3P(H) |
200-230V AC 3P(L) | 200-230V AC 3P(L) | |
Dimension(MM) | 600(L)*720(D)*1450(H) | 600(L)*720(D)*1450(H) |
Weight(KG) | 150 | 150 |
Product detail pictures:
Related Product Guide:
Good quality comes 1st; assistance is foremost; business enterprise is cooperation" is our business enterprise philosophy which is regularly observed and pursued by our company for Short Lead Time for Air Cooled Industrial Chiller - WVCP550 Water Vapor Cryopump Cryogenic Refrigeration Systems – Xieyi , The product will supply to all over the world, such as: Poland, Angola, Brunei, We expect to deliver merchandise and services to more users in global aftermarket markets; we launched our global branding strategy by providing our excellent products and solutions all over the world by virtue of our well reputed partners letting global users keep pace with technology innovation and achievements with us.
By Griselda from Belize - 2017.01.28 19:59
We are a small company that has just started, but we get the company leader's attention and gave us a lot of help. Hope we can make progress together!
By Jean from Turin - 2018.12.22 12:52